How many bags of cement in a cubic meter of concrete
With the 1 : 2 : 3 reference mix, a cubic meter of concrete takes 350 kg of cement, which is 7 bags of 50 kg, with 0.55 m³ of sand and 0.84 m³ of gravel.
Calculate the cement, sand and gravel
Dosage per cubic meter by strength
| Strength and mix | MPa | Cement (kg) | 50 kg bags | Sand (m³) | Gravel (m³) | Water (liters) |
|---|---|---|---|---|---|---|
| 4,000 psi (1 : 2 : 2) | 27 | 420 | 8.4 | 0.67 | 0.67 | 190 |
| 3,555 psi (1 : 2 : 2.5) | 24 | 380 | 7.6 | 0.60 | 0.76 | 180 |
| 3,224 psi (1 : 2 : 3) | 22 | 350 | 7 | 0.55 | 0.84 | 170 |
| 3,000 psi (1 : 2 : 3.5) | 20 | 320 | 6.4 | 0.52 | 0.90 | 170 |
| 2,400 psi (1 : 3 : 3) | 16 | 300 | 6 | 0.72 | 0.72 | 158 |
| 2,000 psi (1 : 3 : 5) | 14 | 230 | 4.6 | 0.55 | 0.92 | 148 |
Dosing by volume on small jobs
The Argos booklet measures sand and gravel with a box of fixed volume. A 33 × 33 × 33 cm box holds 0.036 m³, the volume of a 50 kg bag of cement. The 1 : 2 : 3 mix takes one bag of cement, two boxes of sand and three of gravel. The booklet gives 23 to 25 liters of water per 50 kg bag for conventional mixes.
How the calculation works
Example: a 5 × 4 m slab 0.10 m thick is 2 m³. With the 1 : 2 : 3 mix you need 700 kg of cement, which is 14 bags. You also need 1.10 m³ of sand, 1.68 m³ of gravel and about 340 liters of water.
Common mistakes when preparing concrete
- Dosing with buckets, shovelfuls or wheelbarrows. The Argos booklet calls for a measuring box of fixed volume for the sand and gravel.
- Adding too much water. The booklet warns that excess water sharply reduces strength. Measure the water in containers and do not add it with a hose.
- Comparing bags of different weight. General use cement comes in 50 kg and 42.5 kg bags. Confirm the weight before counting.
To quote cement go to cement. For cement types and stage-by-stage purchasing read how to buy cement for a project. For the steel in the same structure see the weight of rebar per meter.
Frequently asked questions.
With the 1 : 2 : 3 reference mix it is 350 kg, which is 7 bags of 50 kg. For 3,000 psi the Argos dosage table gives 320 kg, which is 6.4 bags.
At 10 cm thick the slab is 1 m³. With the 1 : 2 : 3 mix that is 7 bags of 50 kg. For another thickness multiply the area by the thickness in meters and use the calculator.
One bag of cement, two boxes of sand and three of gravel. Per the Argos booklet, a 0.036 m³ box equals the volume of a 50 kg bag.
In the Argos table it runs from 148 liters for 2,000 psi to 190 liters for 4,000 psi. With the 1 : 2 : 3 mix it is 170 liters. With very wet aggregates the water is reduced.
The structural design sets the strength of each element. The engineer decides whether the concrete is mixed on site or arrives ready-mixed. Use these figures as a reference to estimate purchases.
There are 20 bags of 50 kg. In 42.5 kg bags it is about 23.5.
- Argos Colombia, Aprende a dosificar el concreto (tabla de dosificación de concreto, cantidades por m³: cemento, arena, grava y agua por resistencia; dosificación 1 : 2 : 3 como referencia)
- Cementos Argos, Preparación de concreto en obra, guía básica versión 2 (dosificación por volumen, cajón de 0,036 m³ y agua por saco)
- Holcim Colombia, Cemento Fuerte ECOPlanet 50 kg (uso general, NTC 121, presentación en bulto de 50 kg)
- Holcim Colombia, Cemento Fuerte ECOPlanet 42,5 kg (uso general, NTC 121, presentación en bulto de 42,5 kg)